Prodotti
- Apparecchiature di controllo di solidi
- Triple Deck Shale Shaker
- Moto lineare Shale Shaker
- Degasaggio sotto vuoto
- Pulitore di fanghi
- Dissabbiatore
- Desilter
- Decantazione centrifuga
- Sludge Vacuum Pump
- Verticale taglio asciuga
- Essiccazione Shale Shaker
- Getto fango Mixer
- Agitatore di fango
- Pompa centrifuga
- Shear pompa
- Pompa sommergibile liquami
- Pistola di fango
- Separatore Gas di fango
- Dispositivo di accensione del fuoco
- Pompa a vite
- Serbatoio di idratazione
- Serbatoio di fango
- Camera Motor Control Center
- Trasportatore a coclea
- Offshore Mud Skip Container
- Barite Bulk Silo
- Sistema di controllo di solidi
- Ricambi
Contatto
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Casi
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
News aziendali
Drilling Cutting Disposal System Sent to Moldova in Europe
2020-06-28
On June 24th, Brightway officially shipped a skid-mounted drilling cutting disposal system customized for a drilling project in an oilfield in Moldova, Europe.
Compared with the previous drilling cutting disposal system, this set of drilling cutting disposal system is characterized by an integrated skid-mounted design. In addition to the core equipment of the vertical cutting dryer and decanter centrifuge, this skid-mounted drilling cutting disposal system also integrates the screw conveyor and the hopper on the same skid, which makes the system more integrated. Meanwhile, this skid-mounted drilling cutting disposal system solves the problems of incomplete transportation of materials and leakage of drill cuttings by traditional external screw conveyors, thereby greatly improving work efficiency.
At present, the delivery work has been completed and it will be sent to Shanghai Port. It is expected to be delivered to the Moldova project site for assembly in 45 days. Brightway has been continuously developing, designing and customizing drilling cutting disposal system and corresponding equipment suitable for different oilfield drilling conditions. After years of production and on-site practice, Brightway has gradually developed modular design and skid-mounted integrated design to adapt to different oilfield drilling conditions of drilling cutting disposal system.
If you are interested in the drilling cutting disposal system, please click on the following links: http://www.brightwaysolids.com/Drilling-Waste-Management_d13
Precedente :Happy Dragon Boat Festival 2020
Prossimo :Delivery of a Finland Oilfield Drilling Fluids Waste Management