BWSP-250 Separation Plant For Pipe-jacking Project in Thailand

2025-01-10

 

BWSP-250 Separation Plant For Pipe-jacking Project in Thailand

 

Brightway one set BWSP-250 Separation Plant has been completed commissioning and started operation in Thailand. This Separation Plant will be used to treat the slurry generated during the tunneling process of pipe jacking machines. The Separation Plant is equipped with a shale shaker and a desander/desilter unit, with a processing capacity of up to 250 cubic meters per hour.

 


 

At present, The country is implementing a number of urban infrastructure projects, One project is the laying of underground sewers in MG City. The total length of the project is about 18 kilometers, and divided into several sections of construction, A pipe jacking machine with an inner diameter of 1.8 meters is installed on site. the well depth is 12 meters. After completion, the project will solve problems of the urban drainage and sewage effectively. In this project, Brightway company design and manufacture the slurry separation plant to macth with the pipe jacking machine.

You can know more the details from the page as follow: https://www.brightwaysolids.com/On-site-Service-of-Underground-Pipeline-Project_n244

 

Precedente :Sludge Dewatering Unit for Rive Dredge Dewatering

Prossimo :BWSP-150 Separation Plant for Micro-tunneling Project in Qatar

Modulo di feedback

* Il tuo nome:
* Posta elettronica:
* Azienda:
* Fax:
* Numero di telefono:
* Messaggio: